The U.S. Power Grid - No Magic Pill Normal ▾ 60.000 Hz3,600 rpm Price$0/MWh Demand0 GW Reserves Losses CO₂ Read the story Dismiss Continue ▶ Scenario Demand 0 GW Time 12:00 p.m. ❚❚ ▶ ▶▶ ▶▶▶ Labels Power flow Voltages More… ▾ 500 kV transmission 138 kV subtransmission 12.47 kV distribution 120/240 V service DC link Natural gas price $3.52 Wind strength 100% Cloud cover scenario Battery fast response Slow orbit Reset view Reset knobs and trips Close ✕ The grid in one picture The U.S. power grid is the largest machine people have ever built, and it has a peculiar rule: supply must equal demand every instant, because there is almost nowhere to keep electricity once it is made. The model behind this page is one grid about an eighth the size of the lower 48 states, roughly Texas-sized, stocked with the national mix of plants. On a typical day its generation shares track the real U.S. shares, and a single plant tripping moves its frequency the way it does on a real island grid. 4,528 TWhU.S. generation in 2025, a record (EIA) 1,281 GWutility-scale capacity, end of 2025, plus ~60 GW of rooftop solar 759 GWrecord lower-48 demand, July 29, 2025 ~5%of power lost as heat in transmission and distribution How to use it Look around: drag to orbit, scroll or pinch to zoom, right-drag or two-finger drag to pan.
Click anything, a plant, a substation, the town, to read about it here. Turn the knobs at the bottom: demand, time of day, and under More, gas price, wind and clouds. The readouts at the top left show frequency, price, reserves, losses and the generation mix. Pick a scenario: heat waves, winter storms, an eclipse, a hurricane, blackouts and the restart that follows.
Explore (top right) lists every topic. The Next link at the bottom of each one follows electricity from the plant to your outlet. The coloured dots moving along the wires are power flow. Their speed shows how hard each line is working, and their colour shows its voltage.
Switch on Voltages to colour the wires too. Natural gas The workhorse, and the plant that usually sets the price. 40.2%of U.S. generation in 2025 (1,807 TWh) ~40%of utility-scale capacity, about 500 GW $3.52per MMBtu, the 2025 Henry Hub average (2024: $2.19) $51–129per MWh, new combined cycle, unsubsidized (Lazard 2026) How a combined cycle works A combined-cycle plant runs two engines on one fuel. A gas turbine, essentially a jet engine bolted to the floor, burns gas and spins a generator. Its exhaust, still around 600 °C, boils water in a heat-recovery steam generator, and that steam spins a second turbine.
Getting two generators' worth of work from one fire pushes efficiency to roughly 55–60%, versus about 33% for an old steam plant. Efficiency is quoted as a heat rate, the fuel burned per unit of electricity. A good combined cycle needs about 6.5 MMBtu per MWh. At $3.52 gas that is about $23 of fuel per MWh, plus a few dollars of operations.
That figure is roughly what the plant offers into the market. Why it sets the price In most U.S. markets gas plants are the last ones needed in most hours, so their fuel cost becomes everyone's price (see #market). That is why wholesale power prices rise and fall with gas. Open More and drag the gas price to watch the clearing price follow it.
Trade-offs For: flexible (combined cycles ramp in minutes, peakers start in ten), relatively cheap to build, and about half the CO₂ of coal per MWh (roughly 0.37 versus 1 tonne). Against: fuel arrives just in time by pipeline, with little on-site storage, so the same cold snap that drives demand for gas heating can starve power plants (see #sc-uri). Methane leaks erode the climate advantage, and prices swing. Now: demand growth has set off a rush of new gas projects, but turbines are scarce.
Lazard's 2026 report notes that constrained turbine supply is stretching development timelines well beyond historical norms, and new combined-cycle costs are at a 15-year high. Peakers: the expensive last megawatt Plants built to sit idle most of the year, then save the day for a few hours. A simple-cycle combustion turbine, or peaker, is a gas turbine without the steam half. It burns 9.5–12 MMBtu per MWh, nearly twice a combined cycle, but it is cheap to build and starts in about ten minutes.
Many can also burn oil from a tank on site, which is why oil still shows up in New England's mix during cold snaps when gas pipelines are full. $144–276per MWh, new gas peaker over its life (Lazard 2026) $52–122per MWh just to run an existing one 0.4%of 2025 generation came from petroleum Peakers run few hours, so each start and each hour has to recover a lot of fixed cost. In the model their offers include that start-up cost, which is why the price jumps from the $30s to $50 or more when demand climbs past what the combined cycles can cover. Push the demand knob up on the summer day and watch the marginal unit change from "Combined cycle" to "Gas peaker". The third unit at the model's peaker site is the one you can synchronize by hand in #sync.
Coal Declining for fifteen years, then a 2025 comeback. 16.3%of 2025 generation (737 TWh) +13%more coal power than in 2024, as gas got pricier ~165 GWof capacity, about half its 2011 peak $34–69per MWh to run an existing plant (Lazard 2026) How it works Coal arrives by train; a unit train of about a hundred cars carries 10,000-plus tons, roughly one day's burn for a 1,000 MW plant. The coal is ground to powder finer than flour and blown into a boiler the height of a 20-story building. The fire turns water into steam at more than 500 °C and about 2,400–3,500 psi, and the steam drives a turbine. About a third of the coal's energy becomes electricity.
The rest leaves as warm water through the cooling tower and warm gas up the stack. Trade-offs For: weeks of fuel sit in a pile on site, a real advantage in a winter storm when gas pipelines are constrained. Big spinning machines also provide inertia (see #frequency). Against: the most CO₂ per MWh of any major source (about a tonne), plus sulfur dioxide, nitrogen oxides, particulates, mercury and ash.
Plants are old (many are 40–50 years) and slow: they ramp slowly and cannot go much below about 40% output, which is why coal often runs through negative-price hours rather than shut down. Now: new coal is not being built (Lazard puts it at $72–177/MWh), but retirements slowed in 2025, and the Department of Energy began using emergency orders to keep some retiring plants running. Nuclear About a fifth of U.S. electricity, from under 8% of its capacity, running nearly all the time. 17.3%of 2025 generation (785 TWh), the largest carbon-free source ~97 GWfrom about 94 reactors at 54 plants ~92%capacity factor, the highest of any source $31.76per MWh, average total cost to run the fleet in 2023 (NEI) How it works Uranium enriched to 3–5% U-235 sits in fuel rods in a reactor core. Splitting atoms heats water.
In a pressurized water reactor (about two-thirds of the U.S. fleet), that water is kept under such high pressure that it can't boil, and it heats a separate loop that makes steam. In a boiling water reactor, the core boils the water directly. From there it is a steam plant like coal, at about 33% efficiency, which is why the cooling towers are so big. Those towers release water vapor, not smoke.
Nuclear turbine-generators often have four poles and spin at 1,800 rpm rather than 3,600, because the huge low-pressure turbine blades would fly apart at the higher speed. A fuel pellet the size of a fingertip holds roughly the energy of a ton of coal. Plants refuel every 18–24 months, swapping about a third of the core. Costs: cheap to run, very expensive to build Existing plants are cheap to run: about $32/MWh in 2023, of which fuel was only about $5.
Building new ones has been the problem. Georgia's Vogtle units 3 and 4, the only new U.S. reactors in a generation, came in years late and at more than $30 billion. Lazard's 2026 estimate for new nuclear, based on Vogtle, is $175–255/MWh. Restarting a closed plant is far cheaper, and a few are being restarted, largely on contracts with data-center operators.
Trade-offs and quirks Carbon-free, firm, compact, and plants last 60–80 years with license renewals. U.S. reactors run flat out and rarely follow load. In the model nuclear is must-run: it is paid whatever the price is, even when that price is negative. Plants cannot black start: after a blackout they need reliable off-site power before they restart, so they are among the last to come back (see #blackstart).
Losing off-site power triggers emergency diesel generators to keep the core cooled. Spent fuel has no permanent U.S. home yet; it stays on site in pools and dry casks. Hydropower The original renewable, and the grid's favorite black-start plant. 5.5%of 2025 generation (247 TWh) ~80 GWconventional hydro, plus ~22 GW of pumped storage 6.8 GWGrand Coulee, the largest U.S. plant of any kind The physics in one line Power = water density × gravity × flow × height × efficiency. One hundred cubic meters of water per second falling 100 meters through a 90%-efficient turbine gives 1,000 × 9.81 × 100 × 100 × 0.9 ≈ 88 MW.
Hydro turbines are the most efficient machines on the grid, often above 90%. Water turbines turn slowly, so their generators have many poles: speed = 7,200 ÷ poles in rpm at 60 Hz, so a 40-pole machine turns at 180 rpm and still makes exactly 60 Hz. Its role on the grid Flexible: a hydro unit can go from idle to full in minutes, so operators save water for the hours when it is worth the most. The model gives hydro a daily water budget and spends it on the highest-demand hours.
Black start: it needs only batteries to open its gates and excite its generator, so hydro is the classic plant for restarting a dead grid. Limits: output depends on rain and snowpack, and droughts cut it sharply. River flows also have floors and ceilings for fish and downstream users. In the spring scenario, snowmelt keeps the river high, so hydro can't hold back.
Costs: nearly free to run, very hard to build anew. Most good dam sites are taken, and dams reshape rivers, block fish and flood valleys. Wind One-tenth of U.S. power, from the windy middle of the country. 10.3%of 2025 generation (464 TWh) ~159 GWcapacity at the end of 2025 ~34%typical capacity factor $37–99per MWh, new onshore wind, unsubsidized (Lazard 2026) How it works Power in the wind grows with the cube of wind speed: double the speed and there is eight times the power. A typical new U.S. turbine is about 3.4 MW on a tower around 100 m tall, with a rotor wider than a football field.
No turbine can capture more than 59.3% of the wind's energy (the Betz limit); good ones get about 45%. A turbine starts turning at about 3 m/s, reaches full output around 11–13 m/s, and feathers its blades to shut down above about 25 m/s to protect itself, which is why wind output collapses in a hurricane (see #sc-hurricane). The rotor turns at about 10–15 rpm, so it is not synchronized to the grid. Power electronics convert its variable-frequency output to 60 Hz, which is also why it adds no inertia unless its controls are programmed to.
Why wind bids negative Wind has no fuel cost, and many farms earn the federal production tax credit, roughly $30 per MWh generated. A farm earning it can accept a negative price and still come out ahead, so on windy nights with low demand, wholesale prices go below zero (see #scarcity). In the model, 70% of the wind fleet bids −$25. Trade-offs For: among the cheapest new energy; no fuel, no emissions while running, land between turbines stays farmable.
Against: variable and only partly predictable. The best wind is far from cities, which makes long transmission lines esse
Texto de nomagicpill.site tal como lo publicó, leído de su página y mostrado aquí con el formato de El Autómata. El original, en nomagicpill.site · Volver a la noticia de El Autómata